top of page

QUALIFICATIONS

Bachelor of Engineering (Civil & Structural)
Bachelor of Finance
Chartered Professional Engineer (CPEng)
National Engineering Register (NER)

MEMBERSHIPS & REGISTRATIONS

Engineers Australia (EA) – MIEAust
Registered Building Practitioner TAS (BPTas)
Registered Building Practitioner VIC (RBPV)
Registered Building Practitioner NT (NT Reg)
Registered Professional Engineer of QLD (REPQ)

CHARLIE CUDMORE

SA Regional Manager

BEng (Hons) | BFin | CPEng | MIEAust | NER | RPEQ | BPTas | RBPV | NT Reg

Other Design

Brief / Return Brief

Feasibility Report

Tender Procurement

Inspection Report

Peer Review

Safety In Design

Defects


Certificates

WHS – White Card


Design Tools

Excel

Naviswork

RAPT

Reinforced Concrete Design Software

Revizto

Space Gass

Strand 7

Structural Toolkit

TEDDS

TECHNICAL SKILLS 

Industry Sector

Project Management

Community

Industrial

Institutional

Infrastructure


Residential / Strata

Condition Report

Construction – Documents

Dilapidation

Project – Management

Remedial

Scope of Works

Tenders - Managing


Structural Design

Concrete – Pre-Cast

Concrete – Reinforced

Concrete – Steel Composite

Industrial

Shop Detailing Checking

Steel

Timber

Foundations

Retaining Walls

NOTABLE PROJECTS

Melbourne Metro Tunnel, Arup

The Melbourne Metro Tunnel Project is a major infrastructure development featuring twin 9km rail tunnels and five new underground stations – Arden, Parkville, State Library, Town Hall, and Anzac.

  • Construction Phase Services across all five underground stations.

  • Coordination and design of complex concrete and steel structures within the new stations.

  • Regular consultation with the clients, stakeholders, architects, and various engineering disciplines to resolve problems on site.


High Speed 2 – Euston Station, Arup

The High Speed 2 (HS2) Euston Station project is a major redevelopment of the London terminus, creating a new high-speed railway station featuring 10 platforms, a 300m long concourse, and enhanced connections to the underground.

  • Delivered detailed structural design for major permanent works at the new Euston Station portal, coordinating across multiple disciplines and stakeholders.

  • Gained experience in UK design standards, assurance processes, and large-scale infrastructure delivery.


BHP (Various) Fyfe

Secondment to Engineering Copper SA – Technical Engineering

  • Multiple design packages across Carapateena and Prominent Hill mine sites in South Australia.

  • Feasibility studies, site inspections, design of pipe supports and various steel structures.

  • Involved consulting regularly with the stakeholders and various engineering disciplines to resolve problems on site.

bottom of page